Batir 245x en c89132d8ac7b50bf6dcaac18367d3ab43d53e50a90c3399da8b3d7a9186f83ae
menu
FR

Our quality seal,
visible across Canada.

350 MW Pohénégamook–Picard–Saint-Antonin–Wolastokuk (PPAW-1) Wind Farm

Project category

Energy

Location

Saint-Antonin, Quebec

Customer

PPAW Wind Energy Inc.

Year

2024-2026

 

Additional informations

Complete construction of the 350 MW PPAW-1 Wind Farm in the Bas-Saint-Laurent region, including final engineering and design services for all project components. The wind farm consists of 56 Vestas EnVentus wind turbines rated at 6.2 MW each, with a hub height of 119 m.

Main work carried out

  • Complete construction engineering for the wind farm and its electrical substation;
  • Construction of more than 140 km of roads in a forested environment;
  • Installation of 128 culverts in environmentally sensitive areas, including nine (9) arch culverts;
  • Drilling and blasting operations;
  • Production of granular materials for road construction and the collector system;
  • Construction of 56 concrete foundations (four different designs, including three gravity-type foundations and one rock-anchored foundation);
  • Management and handling of electrical equipment for the collector system;
  • Complete installation of the collector system, including an overhead river crossing;
  • Receiving, assembly, and complete installation of 56 Vestas V162 6.2 MW HH119 wind turbines;
  • Installation of electrical connections within the wind turbines;
  • Installation of service lifts within the wind turbines;
  • Complete construction of the wind farm electrical substation;
  • Construction of a meteorological mast and its connection to the wind farm network;
  • Construction of the wind farm’s Operations and Maintenance (O&M) building;
  • Coordination and management of all pre-commissioning tests (mechanical and electrical).

Our partners for the leadership summit 2026