Batir 245x en c89132d8ac7b50bf6dcaac18367d3ab43d53e50a90c3399da8b3d7a9186f83ae
menu
FR

Our quality seal,
visible across Canada.

Extension of Route 138 - Construction of the Washicoutai River Bridge

Project category

Bridges, Viaducts, Roads

Location

Lower North Shore, Quebec

Customer

Ministère des Transports et de la Mobilité durable

Year

2024-2025

 

Additional informations

Construction of Bridge P-18005 on the Route 138 extension, between Kegaska and La Romaine, crossing the Washicoutai River.

Main work carried out

  • Construction of cofferdams;
  • Temporary marine link established by barge between the two (2) riverbanks;
  • Formwork and cast-in-place concrete placement for the bridge abutments;
  • On-site concrete production;
  • Construction of four (4) retaining walls connected to the abutments;
  • Pre-assembly and marine transportation of the bridge steel structure;
  • Erection of the steel bridge structure on the abutments (single span of 81 m);
  • Formwork, concrete placement, and finishing of the cast-in-place deck slab on girders;
  • Supply and installation of bridge guardrails on the deck;
  • Transportation logistics and material supply management for a remote site without road access.

Our partners for the leadership summit 2026