HQ - 315 kV switching station

Project category

Energy

Location

Anjou, Montreal, Quebec

Value($)

36,1 M$

Customer

Hydro-Québec

Year

2023-2024

 

Additional informations

Construction of a new 315 kV switchyard. The project mainly comprises architecture, civil engineering, electrical installation, control, telecom and underground lines. Work carried out in joint venture with Arno Électrique Ltd.

Main work carried out

  • Excavation (+/- 100 000 m3) ;
  • Backfill (+/- 200,000 tons);
  • Formwork/concrete for 148 foundation units ;
  • Installation of 432 prefabricated concrete bases weighing between 2 and 20 tonnes each;
  • Supply and installation of an architectural fence (including 98 concrete bases) ;
  • Steel structure and building envelope;
  • Mechanical and HVAC work;
  • Storm drainage and plumbing ;
  • Electrical work on the building ;
  • Underground line work ;
  • Architectural works ;
  • Assembly and erection of steel structures ;
  • Installation of electrical equipment ;
  • Installation of electrical and control panels and cables ;
  • Construction of electrical boxes ;
  • Site restoration.